Wednesday, June 22, 2011

Support RDA’s in the CA Budget!

With budget cuts effecting many sectors of California,redevelopment agencies (RDAs) are not exempt. ACEC is part of a coalition to save RDAs through either a budget deal or legislation such as AB 1250. AB 1250 requires empirical evidence showing “prevalence of specific conditions of blight so substantial they prevent proper utilization of a proposed redevelopment area.”

If approved, AB 1250 would also require performance-based goals for a development and ensure at least 50% of non-housing expenditures are focused on “job creation, transit-oriented development, remediating contaminated property, military base conversion, basic infrastructure needs, or affordable housing.”

ACEC CA asks for your continued support of RDAs through this time of uncertainty.

Friday, June 17, 2011

EEA Update: Penfield & Smith, Inc. Wins 2011 Engineering Excellence Merit Award for Amargosa Creek Underground Conveyance Project


Penfield & Smith, Inc. received a Merit Award for the Amargosa Creek Underground Conveyance Project. The City of Lancaster contracted P&S to provide innovative design and construction phase services for a high-quality, durable underground conveyance structure, large enough to carry 2,500 cubic feet per second (cfs) travelling at 15 feet per second (fps), for nearly a full mile. The team implemented a porous channel liner to accommodate this demand, and designed the project to be easily accessible for maintenance crews, and aesthetically appealing to the public. The project was completed in May of 2010, ahead of schedule and within budget.

Thursday, June 9, 2011

EEA Update: Mark Thomas & Company Project Wins 2011 Engineering Excellence Merit Award

Mark Thomas & Company received an Engineering Excellence Award (Merit) for the Foster City Consolidated Wetland Mitigation Site. This site provides mitigation for three separate projects which resulted in increased project development and cost efficiencies while maximizing ecological benefits. State of the art science was used to design a new marsh that operates like a naturally occurring one. The project also provides safety and recreational benefits through increased flood protection and construction of a portion of the Bay trail.

Monday, May 16, 2011

Just Like We've Always Said: Follow The Money!

Despite all of the dire warnings about how using the public-private partnership format to complete the improvements to San Francisco's Doyle Drive entrance to the Golden Gate Bridge would end up in disaster, now comes news that 16 private banks are now looking to fund the project.

Click Here to Read Article.

Tuesday, May 10, 2011

EEA Update: PBS & J Wins 2011 Engineering Excellence Merit Award

Atkins (formerly known as PBS&J), honored 2011 ACEC California Engineering Excellence Merit Award for the Haven Avenue Grade Separation Bridge

A Merit Award also goes to Atkins (formerly known as PBS&J) for the Haven Avenue Grade Separation Bridge project. Atkins developed an innovative architectural concept and structural design for the Haven Avenue Underpass that is economic, effective, and a bold compliment to the backdrop of the San Gabriel Mountains. This innovative solution featured precast colored concrete arched girders spanning between arched piers. Locally produced prefabricated arch girders, pilasters, and balustrade railing units provided precise quality, reduced formwork cost and accelerated construction. Due to Atkins’ innovative solutions and close coordination with the City of Rancho Cucamonga, the result is a visually stunning bridge that was constructed on an aggressive schedule and met budgetary constraints.

Video: http://www.pcidesignawards.org/pages/TE_02/TE_02.html

Issue: http://www.aspirebridge.com/pdfs/magazine/issue_18/Haven_Avenue_Web.pdf

Wednesday, April 27, 2011

EEA Update: International Bridge Technologies, Inc.’s, The Pitt River Bridge, Wins 2011 Engineering Excellence Merit Award



A Merit Award goes to International Bridge Technologies, Inc. for the Pitt River Bridge. International Bridge Technologies, Inc. was contracted by Associated Engineering to work on the detailed design of this cable stayed bridge as part of the design/build team headed by Kiewit Construction and engineering consultant Marshall Macklin and Monaghan. The new bridge replaced two existing two-lane bridges on the Pitt River connecting Pitt Meadows and Port Coquitlam near Vancouver, British Columbia. With seven lanes of traffic and one lane dedicated to bicycles and pedestrians, it has eliminated the Highway 7 bottleneck created by the existing swing span bridges. This iconic structure supported by three planes of stay cables was opened to traffic ahead of schedule in the fall of 2009.



Monday, April 25, 2011

EEA Update: Fuscoe Engineering's Sunset Park Project Wins 2011 Engineering Excellence Merit Award

Fuscoe Engineering, Inc. received an Engineering Excellence Award (Merit) for Sunset Park in the City of San Marcos. Fuscoe Engineering, Inc. was contracted by the City of San Marcos as the prime consultant to provide Full Circle Thinking® solutions to address grading and drainage challenges and to preserve a natural stream and wetlands area. The end result is a more sustainable and ecologically harmonious park design that has a positive impact on the community.




News Release: http://www.fuscoe.com/press_releases/110314.html

Friday, April 22, 2011

EEA Update: Fugro West, Inc. Honored for the Hueneme Outfall Replacement Project

A Merit Awar d goes to Calleguas Municipal Water District and Fugro West, Inc., for the Hueneme Outfall Replacement Project. Fugro was contracted by the project’s design engineer, Black & Veatch, to provide marine survey, marine geophysical surveys, and geotechnical evaluation and design. Fugro also provided geotechnical and construction materials testing services to Calleguas throughout the construction phase. The Hueneme Outfall project consists of 2,300 feet of horizontal directionally drilled 36-inch OD HDPE pipe that exists in 30 feet of water off of the coast of Port Hueneme, Ventura County.



Project challenges include successfully permitting one of the few new ocean outfalls in California, sequencing operations to minimize drilling fluid escape to the ocean, 24-hour construction in a highly visible recreational area adjacent to a densely populated residential neighborhood, and construction conducted within two separate and very limited seasonal windows due to weather and regulatory restrictions.

Tuesday, April 19, 2011

EEA Update: Dokken Engineering Honored for the I-5 HOV/Lomas Santa Fe Drive Interchange Project

Dokken Engineering received an Engineering Excellence Award (Merit) for the 1-5 HOV/Lomas Santa Fe Drive Interchanges project. The diverse project team created solutions to effectively balance the needs of the City of Solana Beach, Caltrans, and the community. Throughout the process, Dokken continually engaged the City by attending City Council meetings as well as holding project development team meetings, monthly coordination meetings, and field meetings. During the construction phase, Caltrans implemented A+B methodology which encouraged the contractor to reduce the construction time and finish a year ahead of schedule. This allowed the HOV lanes to be open to traffic prior to the start of the U.S. Open Golf Championship at Torrey Pines and the San Diego County Fair at the Del Mar Fairgrounds. The end result was a project, delivered ahead of schedule and under budget that provided an economical and cost-effective solution for the city.

Monday, April 4, 2011

Degenkolb Engineers Honored for the Caltrans District 4, Seismic Upgrade Project

A Merit Award was given to Degenkolb Engineers for the seismic upgrade of the Caltrans District 4 Headquarters, a 15-story 750,000 square foot steel moment frame structure that houses the San Francisco Bay Area’s transportation management center including its emergency response team. A team under the direction of Degenkolb Engineers as prime design consultants employed extensive state-of-the-art analysis techniques, a building damping system, and full scale upgraded connection testing to design a retrofit scheme that will protect the building. The team was challenged with providing a seismic upgrade to the building while it remained in full operation, also while staying within the project schedule and budget limitations. Upon completion, Degenkolb’s team had met and satisfied all the goals and timelines of the owner.

Friday, March 25, 2011

A Bridge Too Far?

We have been saying it for years, but no matter how often it is said—or how many others join the chorus—the basic problem persists: California’s transportation infrastructure is among the worst in the nation….and, no surprise, it keeps getting worse, not better.

This week, Transportation for America, a Washington, DC-based non-profit, again documented the problem. California’s bridges and elevated roadways are now ranked the 18th worst in the nation. One in eight of our state’s bridges is considered to be a “high priority” for repair. The problem is so bad that just last week the federal government announced the adoption of new bridge inspection standards.

Perhaps most troubling is that the report finds that the average age of California’s bridges is 44.4 years. Most bridges are designed to last just 50 years. Does that portend a new wave of structurally deficient bridges?

The problem appears to be more severe in northern California. According to the study, in the San Francisco Bay Area one in five bridges are in the high priority category. In fact, San Francisco is at the top of the list of the group’s cities in America for concern over bridge conditions and safety. And outlying parts of the Bay Area do not have it any better. Solano County has 61 bridges that are “structurally deficient.”

The public understands that this is a serious matter. A recent national poll found that 91 percent of the voters believe that repairing and maintaining our roads and bridges should be the top priority for state transportation spending. [make “recent national poll” hot: http://www.smartgrowthamerica.org/documents/lessons-from-the-stimulus.pdf]

How on earth did we get here? California has one of the largest economies in the world. Last year, the state spent $907 million in federal dollars on bridge repair, far more than any other state. Yet still we have not kept pace. Part of the problem is that state and federal transportation funding fluctuates from year to year. Another problem is that inflation has eroded the purchasing power of the gas tax. Another problem is that multiple studies have found that Caltrans has higher than average overhead costs.

Another problem is the terrible financial condition of the State of California. California now has the lowest credit rating of any state in the union and so must pay the highest interest rates when it borrows money and issues bonds. Also, according to the State Treasurer, the State’s debt service on already approved bonds will reach the historically unprecedented level of ten per cent of the state’s total general fund spending.

There is a project delivery technique, which avoids these problems, which is getting more and more use throughout the United States and indeed around the world. That technique is public-private partnerships (P3s), which combine public sector oversight and project sponsorship with private sector financing, expertise and accelerated project delivery.

P3s are especially vital to California now, when our economy is down, when people are hurting and when voter approval of tax increases is difficult to achieve.

Support for expanding California’s use of P3s has grown and grown. Construction unions, business leaders, public policy commentators, local public officials and many others now support the use of P3s to finance and quickly deliver need transportation projects. It represents a timely, innovative solution to fixing our critical infrastructure.

Unfortunately, though, when it comes to actual use of P3s, California severely lags most other states and many nations. The reason for that lag is not hard to find: A politically powerful union of Caltrans employees (Professional Engineers in California Government or PECG) has fought California’s use of P3s in every possible way: in the legislature, during the state’s administrative procedures, in the courts and in the media.

At this point what California needs is a complete overhaul of our approach to financing and fulfilling infrastructure projects in the state. To move forward we need to bring together the best that the public and private sectors. And we need to get moving quickly. We must not ignore the need to fix our structurally deficient bridges and elevated roadways.

Tuesday, March 15, 2011

Cinquini & Passarino, Inc. Honored for the Sonoma-Marin Area Rail Transit Top of Rail Survey AECOM Project

Continuing our series on the recent Engineering in Excellence Awards, a Merit Award was given to to Cinquini & Passarino, Inc. for the Sonoma ~ Marin Area Rail Transit, Top of Rail Survey. Cinquini & Passarino, Inc. was contracted by HDR, Inc. to perform a top of rail survey for the northerly 60 miles of the Sonoma ~ Marin Area Rail Transit corridor. Cinquini & Passarino, Inc. was the first surveyor in the United States to incorporate an Amberg GRP rail measuring instrument with RTK GPS connected to a virtual survey network to survey 60 miles. Performing the field work using conventional survey technology would have taken 90 days. Cinquini & Passarino, Inc. completed the field work in less than 10 days. Using the Amberg GRP, Cinquini & Passarino, Inc. was able to accurately collect the horizontal and vertical position of the existing rail, existing track stationing, existing rail gauge and superelevation as well as the railroad station of roadway, bridge abutments, and culvert crossings needed throughout the rail corridor. Incorporating the unique technology and creative approach to collect the top of rail information from a rolling platform, Cinquini & Passarino, Inc. was able to quickly and accurately collect all of the necessary rail data required by HDR, Inc. The survey was seamlessly incorporated into the project’s existing LiDAR survey.

Sunday, March 13, 2011

AECOM Technology Corporation Honored for the Mineta San Jose International Area Improvement Project

Several Merit Awards were granted to firms who entered ACEC California’s Engineering Excellence Awards.

A Merit Award was presented to AECOM Technology Corporation for its participation in the design and implementation of the Terminal Area Improvement Program on behalf of Granite Construction and Fentress Architects for the Mineta San José International Airport. AECOM acted as the lead Roadway Design Engineer for Granite Construction and as the Civil Engineer for Fentress Architects on the terminals as part of a design-build team. The Terminal Area Improvement Program is the largest public works project in the City of San José’s history and the first project the City has undertaken using the design-build delivery method. It is also currently the largest design-build airport project in the United States. AECOM’s roadway improvements are saving travel time, lowering emissions, and improving air quality. The team’s commitment to sustainable design resulted in one of the largest airport solar power installations in the U.S., and the first LEED Silver certified new passenger terminal west of the Mississippi River. AECOM and its design-build partnersdelivered this project three months ahead of schedule and $60 million underbudget.

Tuesday, March 8, 2011

Stantec Consulting Services Inc. Honored for the Research Support Facility for National Renewable Energy Laboratory

Continuing our series on the recent Engineering in Excellence Awards, an Honor Award was given to the San Francisco office of Stantec Consulting Services for the firm’s work on the Research Support Facility, National Renewable Energy Laboratory in Golden, Colorado. Now the nation’s largest building designed to achieve net-zero energy use—this 222,000 square-foot facility allows its 800 occupants to consume only the amount of energy generated by the renewable power on and near the building. An inspired and bold vision brought to reality by a progressive and dedicated Design-Build team, this building has set a truly remarkable standard and example for the industry. For more on the project:

http://archrecord.construction.com/news/daily/archives/2010/10/101001integrated_design.asp

Thursday, March 3, 2011

Once More into the Breach

Yet again the executive of the Professional Engineers in California Government (PECG), in the name of its membership, is off to the Appeals Court in an attempt to delay or derail a legitimate engineering project in which PECG believes the private sector plays too great a role and PECG members too little.

No surprise there. The "I'm All Right Jack" position consistently taken by the union representing state payroll engineers is one of the reasons that our state is in the state it is in.

PECG's litigious position might be understandable if its members' livelihoods were threatened by projects like the Presidio Parkway, but the fact is that more than 90 percent of the transportation design work in the state is in the hands of the public sector engineers already and there's little sign that is going to change. That's a far higher proportion of work going to the state payroll than any other state in the union, and any country in the world with the possible exception of China. As a result, our state engineer payroll is one of the largest in the world. It even grows during recessions!

So, because PECG can't come out and say that their jobs are put at risk by public private partnerships (P3s) like Presidio Parkway, they instead claim to oppose because they are protecting the taxpayer. Presidio Parkway, they claim, will place an undue burden on future taxpayers, even though studies have shown that this project will be less costly to build under the structure proposed by Caltrans and SFCTA, the agencies responsible for the project.

Mr. Blanning's apparent assertion that the Presidio Parkway P3 will become a taxpayer liability is even more disingenuous at a time when the state struggles with the very much larger question of how to pay one of its biggest unfunded liabilities: the more than $500 billion (and growing) in pension obligations demanded by Mr. Blanning's members and other state sector unions. If Mr. Blanning is really concerned about undue financial burdens placed on the taxpayer, he should be talking about that and not a legitimate project which, precisely because it is structured as a P3, will cost taxpayers less to build than a traditional state managed project and will be built on time to the highest standards.

Tuesday, March 1, 2011

Parsons Corporation for the Bakersfield Wastewater Treatment Plant 3 Upgrade and Expansion

ACEC CA has recognized Parsons Corporation, as a finalist this year for ACEC California’s Engineering Excellence Awards for the Bakersfield Wastewater Treatment Plant 3 Upgrade and Expansion, addressing capacity (16 mgd to 32 mgd) and renewable energy and regulatory requirements including nitrogen removal for groundwater recharge.

Prior to the upgrades, Plant 3 continuously violated its effluent discharge permit. As the design engineer, Parsons incorporated several innovative, out-of-the-box process modifications, as well as cost- and energy-saving ideas such as an extensive and creative odor control for the zero odor plant, conversion of old secondary clarifiers to covered primary clarifiers, an integrated renewable energy system with biomass energy and PV solar energy for significant GHG reduction, and LEED-type buildings. This sustainable design earned more than $3.5 million in rebates/grants from PG&E and ARRA. PG&E estimates an annual operating cost savings of $556,000 for the upgraded plant. Completed on time with no recordable OSHA accidents, Plant 3 has outperformed all regulatory requirements.

Thursday, February 24, 2011

Degenkolb Engineers for The Bowls Project

Inspired by ancient Babylonian amulets known as “demon bowls,” The Bowls Project is a unique multimedia art installation in which antiquity meets high-tech seismic design. It consists of 2 domes that sit atop a state-of-the-art base-isolated platform that Degenkolb Engineers designed for seismic safety. The project team worked tirelessly and donated time and material on this challenging pro bono project to ensure that it made its opening day. During its limited stay at San Francisco’s Yerba Buena Center for the Arts, thousands will enjoy the workshops and musical performances that take place inside the domes.

Tuesday, February 22, 2011

Safe Water in CoCo County Thanks to Carollo

ACEC CA has also recognized Walnut Creek, Calif.-based Carollo Engineers, Inc., as a finalist this year for ACEC California’s Engineering Excellence Awards for the Middle River Intake Project.

The Contra Costa Water District selected Carollo to serve as program manager for the planning, design, and construction of this $100 million project to improve delivered water quality for its 550,000 customers. The project, which included a setback levee, 250-cfs intake and pump station, and conveyance pipeline and tunnel, featured several innovative design and construction strategies. These included a state-of-the-art intake and pump station that balances intake flow and protects Delta fisheries, a detailed construction sequencing plan that allowed key project elements to be constructed within two critical in-water work windows, and creative construction techniques to build a conveyance pipeline and 90-foot-deep microtunnel in difficult soil conditions. The resulting project, which was completed on schedule and within budget, improves operational flexibility and provides a safe and reliable source of drinking water to Contra Costa Water District’s customers for years to come.

Wednesday, February 16, 2011

Eastside LA Transit Project on Budget, On Time with Zero Claims.

AECOM Technology Corporation was a finalist in ACEC California’s EEA Awards for its Gold Line Eastside Extension Project linking East LA to Downtown’s Little Tokyo district .

AECOM Technology Corporation, in joint venture with Washington Group International, was the designer for this eight-station, 6-mile-long light rail project that brought rapid transit service. Combining the latest technology with unique, community-inspired art at each station, Metro’s first design-build project was hugely successful. Following 4 million work hours without a lost-time injury, the project came in on schedule, on budget, and with zero claims.

http://www.publicartinla.com/Metroart/GoldLine2/soto.html

Wednesday, February 9, 2011

California Engineering Projects: Excellent!

ACEC California’s Engineering Excellence Awards competition has grown in stature and size over the years. This year, no less than 46 major projects were considered for awards and in the next 22 weeks we’ll be profiling many of them.

The competition has become an effective tool for engineering and surveying firms to gain much-deserved recognition for projects that benefit local communities and California as a whole. Indeed, last year, a California project garnered the coveted national Grand Conceptor Award bestowed by ACEC’s national organization in Washington DC. HDR Engineering’s Advanced Energy Recovery System (ARES) designed and built for onion processor Gills Onions in Oxnard, Calif. was a prime example of private sector initiative and expertise in action.

This year, ACEC California is proud to announce that the Golden State Award goes to T.Y. Lin International for the East Tie-In Structure, which is part of the San Francisco-Oakland Bay Bridge Seismic Safety Projects. The Joint Venture of T.Y. Lin International/Moffat & Nichol was contracted by California Department of Transportation to design the 288 foot-long detour structure, a double deck steel truss, that was assembled 150 feet above ground and rolled into place over the course of a four-day long weekend. This temporary detour set the highest standard for engineering excellence and marks an unprecedented feat of design engineering and is the most significant realignment of traffic to the Bay Bridge to date.